Construction process:
building is under construction and will be completed in late 2012 or early 2013.


LUX / building process
The building is constructed out of concrete, steel and glass with the ultimate excellence of luxury achieved by simplicity in design.



LUX / building site in summer 2012
The built ground floor already shows the overall form of the house with its angular facades. The sundeck is to the far left, the living room in the middle and the study to the right. Entry to the site is to the far right.



LUX / view from the the building site
The view from the upper floor is full 180 degrees of pure nature and water overlooking the Lake Pyhäjärvi. The master bedroom continues as the sundeck in the middle of the image.


updated 2012-07-11